The Harrow home care framework is a new eight-year, seven-lot framework through which the London Borough of Harrow will buy long-term home care, reablement and children’s home care, with an estimated value of £160 million and a tender deadline of 1pm on 18 December 2026. Prices are fixed by the council, so places will be won entirely on the quality of your written answers.
This guide is for domiciliary care providers deciding whether to bid. It covers the verified facts, how a home care framework works, lot strategy, fixed hourly rates, CQC evidence, quality answers and a timeline to the deadline.
Updated November 2026.
- What is the Harrow home care framework?
- What is a home care framework and how does it work?
- Should you bid for the Harrow home care framework?
- Which lots should you bid for?
- What do fixed hourly rates mean for your margins?
- What CQC evidence will Harrow expect?
- How do you score highly on the quality questions?
- Harrow home care framework timeline to the deadline
- Common mistakes to avoid
- Frequently asked questions
- Conclusion: decide early and let your evidence do the work
What is the Harrow home care framework?
The Harrow home care framework is a multi-provider framework agreement for adult long-term home care, community-based adult reablement and children’s home care (ages 0 to 18), split into seven lots by service and geography. The Harrow home care framework is procured under the Procurement Act 2023 and published on Find a Tender as notice 108319-2026 (reference DN830645), dated 16 November 2026.
This Harrow home care framework is a re-run. The council published an earlier home care tender in January 2026 under the open procedure, but its Cabinet approved abandoning that tender on 11 June 2026 and agreed to start a new competitive process. If you bid last time, the structure, procedure and questions have changed.
The key facts about the Harrow home care framework from the notice are below.
| Item | What the notice says |
|---|---|
| Buyer | London Borough of Harrow |
| Estimated value | £160,000,000 including VAT, over an overall term of eight years including successor frameworks. This is an estimate, not guaranteed spend. |
| Initial framework | 1 September 2027 to 31 August 2030 |
| Overall scheme | Open framework scheme ending 31 August 2035, with break and review at Year 3 and Year 6 |
| Lots | 7 (three adult long-term, three adult reablement, one children’s) |
| Maximum providers | 84 across the framework; maximum per lot set out in the ITT |
| Pricing | Fixed hourly rates set by the council. Bidders do not submit prices; they confirm acceptance of the rates. |
| Procedure | Competitive flexible procedure, light touch regime |
| Evaluation | Quality only: Method Statement Questions, 100% |
| Allocation | Taxi rank model for call-off packages |
| Clarification deadline | 4 December 2026, 11:59pm |
| Submission deadline | 18 December 2026, 1pm |
| Portal | London Tenders Portal (londontenders.org) |
| Suitable for SMEs and VCSEs | Yes, for every lot |
You can also find this opportunity, and similar home care tenders across London, on our free Open Tenders search.
New to finding these opportunities? This short walkthrough shows how to find domiciliary care tenders in the UK step by step.
What is a home care framework and how does it work?
A home care framework is an agreement between a council and a group of approved providers that sets the terms, quality standards and (often) prices for future care packages, without guaranteeing any volume of work. Being on a framework makes you eligible for referrals; individual packages are then awarded as call-off contracts.
Councils use frameworks because demand fluctuates and no single provider can cover a whole borough. They usually work in three steps:
- Appointment: providers pass selection checks and score well enough on quality (and sometimes price) to win a place on one or more lots.
- Allocation: when a package is needed, the council offers it to framework providers using a set method. Common methods are a taxi rank (offered in ranked order), mini-competitions or an e-brokerage system.
- Call-off: the provider that accepts the package delivers it under a call-off contract on the framework terms.
Open frameworks under the Procurement Act 2023
The Harrow home care framework uses an open framework scheme, a newer model under the Procurement Act 2023. Under section 49 of the Act, an open framework must be reopened at least once in the first three years and then at least once in every five years, and the whole scheme must end within eight years of the first award. Harrow plans to reopen at Year 3 and Year 6.
For providers bidding for the Harrow home care framework, this matters in two ways. If you are not ready now, there should be another chance at Year 3. If you win a place, you will need to compete again at each break and review, so the evidence you build from 2027 onwards will feed your next bid.
Framework vs DPS vs approved provider list
| Route | Can new providers join? | Typical use in home care |
|---|---|---|
| Closed framework | No, until it is re-procured | Fixed provider panels for a set term |
| Open framework (Harrow’s model) | Yes, at each planned reopening | Multi-year home care panels with periodic refresh |
| Dynamic market or DPS | Yes, at any time during its term | Spot purchasing and wide provider pools |
For more on how domiciliary care tenders are structured across councils, see our domiciliary care tender support page.
Should you bid for the Harrow home care framework?
Bid if you are CQC registered for personal care, have a rating the council will accept, can recruit and deploy care workers in the Harrow locality you choose, and can deliver profitably at the council’s fixed rates. If any of those is uncertain, resolve it before you spend time writing.
A quick go or no-go test for the Harrow home care framework:
- Registration and rating: the notice says the PSQ includes mandatory pass/fail questions on CQC rating and geographic area. Check the exact threshold in the PSQ before anything else.
- Location: can you run efficient rounds in Harrow West, Central or East? Travel time comes out of a fixed rate.
- Capacity: under a taxi rank, if you cannot accept quickly, the package moves on.
- Rates: read the fixed rates in the procurement documents and test them against your cost model (see below).
- Evidence: with price removed, outcomes data, audits, case examples and feedback are what separate scores.
Which lots should you bid for?
Bid for the lots where your staff already live and work, up to the council’s limit of four lot awards per supplier. The Harrow home care framework also stops any provider holding both an adult long-term lot and a reablement lot in the same locality.
| Lot | Service | Area |
|---|---|---|
| 1 | Adult long-term home care (18+) | Harrow West |
| 2 | Adult long-term home care (18+) | Harrow Central |
| 3 | Adult long-term home care (18+) | Harrow East |
| 4 | Adult reablement | Harrow West |
| 5 | Adult reablement | Harrow Central |
| 6 | Adult reablement | Harrow East |
| 7 | Home care for children and young people (0 to 18) | Boroughwide |
Practical lot strategy for the Harrow home care framework:
- Lead with your strongest service. Reablement needs a short-term, strengths-based model with measurable goals and close working with therapists and discharge teams. Only bid if you already deliver it or can show a credible model.
- Plan your locality pairs. Because you cannot win long-term and reablement in the same locality, a provider bidding both might choose long-term in two localities and reablement in the third. Bidding everywhere for everything can lead to awards you did not want.
- Understand the ranking rule. If you rank first in more than one locality across Lots 1 to 6, the council will use the methodology in Annex A (Evaluation Rules and Methodology) to decide which lot you get. Read Annex A before you finalise your lot choices.
- Treat Lot 7 as specialist. Children’s home care covers disabilities, complex health needs, respite and behavioural support. You will need children’s safeguarding, consent and family-working evidence, not adult policies relabelled.
What do fixed hourly rates mean for your margins?
Fixed hourly rates mean the council sets the price per hour and every provider on the Harrow home care framework is paid the same rate, so you cannot win on price and you cannot price your way out of a loss. Your margin depends entirely on your costs.
The notice says bidders “must instead confirm their acceptance of the fixed rates as part of their Tender submission”. By accepting, you commit to deliver the Harrow home care framework at those rates from September 2027. Before you sign, build a cost per contact hour that includes:
- care worker pay, including paid travel time between calls (your average pay must stay above the legal minimum once unpaid travel is counted)
- employer National Insurance, pension contributions and holiday pay
- mileage or travel costs, which vary sharply between localities
- training, supervision, spot checks and shadowing
- electronic call monitoring, care planning software and phones
- registered manager, coordinators and out-of-hours on-call
- CQC fees, insurance, recruitment and office costs, plus contingency for sickness and unfilled hours
The framework starts on 1 September 2027, after the National Living Wage rises to £13.21 an hour on 1 April 2027, as confirmed by the government. Your model should use 2027 pay rates from day one, not today’s. Our guide to the National Living Wage 2027 for care providers shows how to cost that rise.
The notice lists National Living Wage changes and employer costs among the known risks that may require “revisions to pricing mechanisms”. That is not a promise of annual uplifts. Check the framework terms for any uplift clause, and use the clarification window to ask how rates will be reviewed over the term.
If your numbers do not work at the published rate, it is better to decline than to win work that loses money on every hour. If you would like a second opinion on your cost model or your go or no-go decision, book a consultation with our bid team.
What CQC evidence will Harrow expect?
To join the Harrow home care framework you will need current CQC registration for the regulated activity of personal care and a rating that meets the PSQ’s pass/fail threshold, which the notice confirms is a mandatory question. Beyond the pass mark, your inspection evidence is some of the strongest material you can use in your method statements.
Prepare these before you write:
- your CQC registration certificate, location details and latest report, including ratings for each key question (safe, effective, caring, responsive and well-led)
- an action plan and progress update for any area rated Requires Improvement
- recent internal audits: medication, care plans, call monitoring and missed or late visits
- safeguarding records showing how concerns are raised, reported and learned from
- workforce data: turnover, training completion, supervision rates and DBS checks
- feedback from people using your service, families and professionals
If you are not yet rated, check the PSQ wording and ask through the portal before 4 December if it is unclear.
How do you score highly on the quality questions?
Answer every part of every question, in the order asked, with specific evidence from your own service and a clear link to Harrow’s specification. With 100% of the Harrow home care framework marks on method statements, small gaps cost places.
Use the specification as your checklist
The lot descriptions show what Harrow values: person-centred care and independence for adults, strengths-based, measurable outcomes for reablement, and family-centred, safeguarding-led care for children. Map each specification requirement to a sentence in your answer.
Show, don’t claim
Evaluators score evidence, not adjectives. Say what you do, how often, who is responsible and what the result was: for example, monthly medication audits with errors falling over a stated period, or the share of reablement clients who needed no ongoing package.
Make it local
Show how you will recruit in your chosen locality, work with Harrow’s brokerage and hospital discharge routes, and respond when the taxi rank offers a package at short notice.
Answer the scoring criteria, not the heading
Read the scoring guidance in the Evaluation Rules and Methodology document and evidence every element of the top band. Earlier versions of this procurement included a separate social value question, so check whether social value is assessed within the method statements this time.
Harrow home care framework timeline to the deadline
You have less than four weeks, with Christmas approaching. Plan your Harrow home care framework bid backwards from 1pm on 18 December 2026 and aim to submit at least a day early.
| Date | What to do |
|---|---|
| Now to 27 November | Register on the London Tenders Portal, download all documents, check the CQC and geographic pass/fail questions, test the fixed rates and make your go or no-go decision. |
| By 2 December | Agree lot choices, draft PSQ answers, gather certificates, policies and evidence, and list your clarification questions. |
| 4 December, 11:59pm | Clarification deadline. Submit any questions before this and keep checking the portal for answers to other bidders. |
| 5 to 11 December | Draft method statements, then run an internal review against the scoring criteria. |
| 12 to 16 December | Final edit, word count and compliance checks, sign-offs and declarations. |
| 17 December | Upload and submit. Download your submission receipt. |
| 18 December, 1pm | Deadline. Late tenders are normally rejected. |
The notice gives 23 June 2027 as the expected end of the award period, ahead of the 1 September 2027 start. Check whether the PSQ and ITT are both due on 18 December or run as separate stages.
Common mistakes to avoid
Most failed home care bids fail on compliance or vague answers, not on care quality. Watch for these on the Harrow home care framework:
- Ignoring the lot rules. Bidding for long-term and reablement lots in the same locality, or for more than four lots, without a plan for which you actually want.
- Accepting rates without costing them. Confirming acceptance of fixed rates you have not tested against 2027 pay.
- Reusing the January 2026 answers. The questions, weightings and procedure have changed.
- Generic children’s answers. Adapting adult policies for Lot 7 instead of evidencing children’s safeguarding and family working.
- Unsupported claims. Promising capacity or outcomes without data, staff numbers or examples.
- Missing the clarification window. Questions after 4 December may not be answered.
- Last-minute uploads. Portal problems on deadline day are rarely accepted as a reason for lateness.
Frequently asked questions
How much is the Harrow home care framework worth?
The notice estimates £160 million including VAT over eight years, including successor frameworks. It is not guaranteed spend.
Is price scored in the Harrow home care framework?
No. The council has set fixed hourly rates, bidders confirm acceptance, and the award criteria are 100% quality through method statement questions.
When is the Harrow home care framework deadline?
Tenders must be submitted on the London Tenders Portal by 1pm on 18 December 2026. Clarification questions close at 11:59pm on 4 December 2026.
Can I bid for every lot on the Harrow home care framework?
You can bid for more than four, but you can be awarded a maximum of four lots, and not both an adult long-term lot and a reablement lot in the same locality.
Will I get work if I win a place?
Not automatically. Packages are offered through a taxi rank, so work depends on your ranking, your capacity and how quickly you can accept referrals.
What if I miss this round?
The Harrow home care framework has break and review points at Year 3 and Year 6, which should give new providers further chances to join.
Conclusion: decide early and let your evidence do the work
The Harrow home care framework is a sizeable, long-term opportunity for domiciliary care providers in north-west London, but its fixed rates and 100% quality scoring change how you should approach it. Check the CQC and geographic pass/fail questions first, test the rates against your 2027 costs, choose lots that match where your carers already work, and put your best evidence into every method statement.
With the Harrow home care framework deadline at 1pm on 18 December 2026, the providers who decide this week will have the most time to write well. If you want support with your go or no-go decision, lot strategy or quality answers, speak to our bid team today.



